Few Tips on How to Troubleshoot Planner Tasks - Part II

$
0
0



This is a continuation of the troubleshoot guide for planner. Click Here to access the part I of the guide.

 

 

 

Reporting an issue:


 

Issue is created as I set the test to fail status:

 

issue.PNG

 

The Owner of the issue is I827528.

 

Just the Control Owner or the ICMAN have authorizations to Receive an Issue:

 

 

This user must have power user roles or must be the control owner (in this case, as I am working with SOX regulation, the user must be a SOX control owner).

 

 

The business event responsible to deliver this task is:

 

  • 0PC_RECE_ISSUE

 

 

Accessing the task to remediate the issue:

 

remediate.PNG

 

 

This information can be seen in table GRPCCASEIS.

 

 

issue.PNG

 

 

Creating a Remediation Plan:


 

 

When you assign a remediation plan, you set the user you want to be the owner during creation:

 

Remediation plan.PNG

 

In CONTROL_OWN’s inbox, there is a new task:

 

crate remediation.PNG

 

 

Test was set to complete. You can also check this information in table GRPCCASEPL.

 

 

GRPCCASEPL.PNG

 

 

 

We can see the progress of the workflow in SWIA:

 

 

The yellow highlights are the tasks which were completed.

 

Workflow log.PNG

 

 

If you need further information about the step you are in, you can access the task information in the container of the work item ID.

 

 

Workflow details.PNG

 

 

if you have some doubts on the workflow information, you can start debugging sessions based on the Task information:

 

Example:

 

Task.PNG

 

 

Upon clicking on the highlighted task TS75900020, I can see the following screen:

 

 

test log.PNG

 

 

We know Class and Method that are used when this event is triggered. Setting a breakpoint at this point allows users to debug this event.

 

 

Going back to the Close issue activity:


 

 

After pressing submit button within the work item, the status of the work items goes to Reserved

 

 

Close issue.PNG

 

 

The status reserved will continue there until the remediation is not closed by the owner.


After completing the test, the evaluation is sent back to the SOX Control Tester for a Re-Evaluation.


If approved, the process is closed.  The test result is set to Pass.


Pass.PNG



Process is completed in Planner Monitor.



Process is completed.PNG



If you check SWIA after performing all these steps, the whole workflow is completed.



More information will be added upon contribution.